Cyclotron Technical Service & Spare Parts
Cyclotron Technical Service
Our team of adept experts boasts over two decades of invaluable experience handling various commercial cyclotrons. Below, you’ll discover some of the types of cyclotrons we specialize in:
- GE PETtrace 800 Cyclotron,
- GE Minitrace Cyclotron,
- IBA Cyclone 18/9 Cyclotron,
- Siemens RDS 111 & HP ECLIPSE
Cyclotron Spare Parts
All our products and spare parts are built for specific customer requirements and are easily adaptable to various accelerators and conditions. We have developed standard designs for the commonly used GE PETtrace 800 Cyclotron, GE Minitrace Cyclotron, IBA Cyclone 18/9 Cyclotron, and Siemens RDS 111 & HP ECLIPSE. Still, other designs can be made if required. Please let us know if you need specific spare parts
✅ Technical Service Activities - Level 1
- Rebuilding of the Ion Source
- Rebuilding of the Target System
- Rebuilding of the Target Carousel System
- Malfunctions that may occur in valves related to the target sub-system
- Mechanical and target utility pump failures
- Product delivery system malfunctions (replacement of tubings)
- Cooling system and cooling water failures
- Replacement of extractor filters
- Diffusion pump failures
- Explora valve failures
- Replacement of Explora tubings
- Periodic maintenance of the system
✅ Technical Service Activities - Level 2
- RF failures
- Magnet and shunt failures
- Electrical cabinet and power supply failures
- TSU distribution panel failures
- Water cabinet failures
- Extractor drive failures
- Vacuum controller failures
- System software failures
- System computer failures
- VME crate failures
- Explora software failures
- Explora computer failures
- Switch box failures
- Explora electronic board failures
- Bottle Farm Interface Box failures
✅ Cyclotron Installation Procedure Steps
- Material check for cyclotron installation equipment from the supplier.
- Cyclotron ancillary equipment check ( HVAC, Electrical Transformer, water supply, cooling water, gas ...).
- Cyclotron cable installation process initiation.
- Cyclotron target changer system building.
- The water cooling system is working and starting.
- The vacuum system is working and starting.
- Magnet calibration
- RF adjustments.
- IS adjustments.
- Single-beam Faraday working and starting.
- Dual-beam Faraday working and starting.
- Single beam HOT-RUN working and starting.
- Training for Cyclotron (1 week)